The Putian museum is expected next year the main structure completed. The reporter learns, the investment of about 270000000 yuan, is the provincial key projects, and strive to put into use in 2014.
Reporters saw at the construction site, located in the ribbon Creek Park, the construction of more than 200 personnel are wildly beating gongs and drums to work, the project has entered the construction of the main structure. The responsible person said, Putian City Museum in November last year to start construction, by the Tongji University Institute of architectural design and led the design, after the completion of the entire museum looks like a two-edged Ruyi, repose the ribbon Creek river. The project mainly consists of a main hall and a deputy hall. At present, the main hall has been completed 3 layer slab construction, deputy hall has been completed 4 layer slab of concrete. The main works of main hall and deputy hall plan completed in the new year.
It covers an area of 23.5 mu, building area of 26000 square meters. The main building from a four layer of the main exhibition hall and four vice Pavilion, the main hall and the side hall adopts steel frame connected, this is the one big characteristic. The internal layout "Putian history and culture exhibition", "Mazu Culture Exhibition" and so on ten big halls and three temporary exhibition hall.
Reporter learned from the Putian City Museum, the Provincial Department of culture recently announced the provincial level two or three Museum of the list, Putian City Museum to qualify for the provincial level two Museum, Museum of Xianyou County won the provincial level three Museum.
According to the briefing, the Provincial Museum assessment grading into comprehensive management, infrastructure management and scientific research, conservation, exhibition and public cultural service of 5 large, from high to low are divided into Grade A, level two, level three, experts from the provincial cultural relics bureau organization award. According to the regulations, the museum must accept a every 3 years.
No comments:
Post a Comment